01
BENEFITS
- Strategic location
- Labor pool
- Access to the main avenues
- Public transportation
- 24/7 security service
02
CONNECTIVITY
- International Airport | (35 km / 22 mi) |
- Laredo Highway l-35 | (22 km / 14 mi) |
- Downtown Monterrey | (22 km / 14 mi) |
- Downtown San Pedro | (26 km / 17 mi) |
03
INFRASTRUCTURE
- Electricity
- Water and drainage system
- Fiber Optics
MASTER PLAN

PHASE 1


SPECIFICATIONS
Walls | Pre-cast concrete walls 5″ and sheet metal walls |
---|---|
Floor | Concrete Floor with 6″ thickness |
Roof | Galvanized steel KR-18 |
Parking spaces | 214 |
Electrical substation | 7,500 KVAS at AEIP |
Bay size dimension | 52.49 Ft x 49.21 Ft |
Minimum height | 32.00Ft / 9.75m |
---|---|
Dock doors | 4 |
Access ramp | 1 |
Lighting | LED |
Ventilation system | Natural |
Natural lighting | 5% |

SPECIFICATIONS
Walls | Pre-cast concrete walls 5″ and sheet metal walls |
---|---|
Floor | Concrete Floor with 6″ thickness |
Roof | Galvanized steel KR-18 |
Parking spaces | 205 |
Electrical substation | 7,500 KVAS at AEIP |
Bay size dimension | 52.49 Ft x 49.21 Ft |
Minimum height | 32.00Ft / 9.75m |
---|---|
Dock doors | 4 |
Access ramp | 1 |
Lighting | LED |
Ventilation system | Natural |
Natural lighting | 5% |
Our Developments