01
BENEFITS
- Strategic location
- Labor pool
- Access to the main avenues
- Public transportation
- 24/7 security service
02
CONNECTIVITY
| - International Airport | (35 km / 22 mi) |
| - Laredo Highway l-35 | (22 km / 14 mi) |
| - Downtown Monterrey | (22 km / 14 mi) |
| - Downtown San Pedro | (26 km / 17 mi) |
03
INFRASTRUCTURE
- Electricity
- Water and drainage system
- Fiber Optics
MASTER PLAN

PHASE 1


SPECIFICATIONS
| Walls | Pre-cast concrete walls 5″ and sheet metal walls |
|---|---|
| Floor | Concrete Floor with 6″ thickness |
| Roof | Galvanized steel KR-18 |
| Parking spaces | 214 |
| Electrical substation | 7,500 KVAS at AEIP |
| Bay size dimension | 52.49 Ft x 49.21 Ft |
| Minimum height | 32.00Ft / 9.75m |
|---|---|
| Dock doors | 4 |
| Access ramp | 1 |
| Lighting | LED |
| Ventilation system | Natural |
| Natural lighting | 5% |

SPECIFICATIONS
| Walls | Pre-cast concrete walls 5″ and sheet metal walls |
|---|---|
| Floor | Concrete Floor with 6″ thickness |
| Roof | Galvanized steel KR-18 |
| Parking spaces | 205 |
| Electrical substation | 7,500 KVAS at AEIP |
| Bay size dimension | 52.49 Ft x 49.21 Ft |
| Minimum height | 32.00Ft / 9.75m |
|---|---|
| Dock doors | 4 |
| Access ramp | 1 |
| Lighting | LED |
| Ventilation system | Natural |
| Natural lighting | 5% |
Our Developments
